
NingNing|Mar 26, 2025 19:17
Yes, as a high-performance modular AppChain multi chain interoperability version of BeraChain, Initia's main network launch work is much more demanding.
For example, the launch of BeraChain mainnet only requires the deployment of an Infra consisting of a wallet, RPC node network, and block explorer; And besides deploying one set of Infra on the main network, Initia also needs to coordinate the deployment of more than ten sets of Infra for ecological AppChains, as well as the registration and ID allocation of these ecological AppChains.
Of course, Initia's DEV can choose the minimum feasible solution: only supporting the bare mainnet launch of token TGE and liquidity staking, and delaying the integration of ecological AppChain and VIP incentive plans.
But this kind of perception is not good, it will make the market feel that this is another ecosystem bare Celestia type Cosmos SDK PoS chain
There are only 4 days left in March, which is not enough time for Initia to make a big leap from its current state to the mature state before BeraChain main network launch and TGE.
Instead of making mistakes in a hurry, it's better to follow the current pace and arrange a Boyco level pre recharge activity with more APPChains onboard, leaving enough time for the Devs of the mainnet and AppChain to conduct the final round of testing.
Share To
Timeline
HotFlash
APP
X
Telegram
CopyLink