
Bitcoin.com News|Mar 13, 2025 19:31
🚀 Bitdeer’s SEAL03 chip hits 9.7 J/TH efficiency ⚡ with Sealminer A3 production set for late 2025.
- Record energy efficiency achieved in low-voltage prototype testing.
- Sealminer A3 mass production to launch in late 2025.
- Hydro-cooled Texas site energizes 500+ mining rigs ahead of rollout.
Share To
Timeline
HotFlash
APP
X
Telegram
CopyLink